Mosoblgaz issued clarifications to the new rules for connecting to gas networks in the Moscow region. There is an answer to the main question, which concerns citizens in connection with the new gasification rules. Namely, is it really gasified now? a private house  will cost only 50 000 rubles?

The correct answer is no, not true. For 50 000 rubles "Mosoblgaz" will only hold the pipe to the border of your site. Laying the pipe from the fence to the house, the construction of an internal gas pipeline, drawing up a project - all this will have to be paid separately. What will be the final cost and how much it will be below current prices, it is difficult to say today.

New rules for connecting to gas networks. Effective March 1, 2014

The new rules of technology for connecting capital construction projects to gas distribution networks, set forth in Decree No. 1314 of the Government of the Russian Federation of December 30, 2013, entered into force on March 1, 2014.

Gasification under the new rules: three categories of consumers

As Mosoblgaz reports, all consumers are divided into three groups. The first group includes those subscribers whose gas consumption will not exceed 15 m3 per hour with projected working pressure in the attached gas pipeline to 0.3 MPa for legal entities and 5 m3 per hour for individuals.

The next group is those consumers whose gas consumption will not exceed 500 m3 per hour (these are small or medium-sized businesses, cottage villages or a medium-sized boiler house) with the projected working pressure in the attached gas pipeline up to 0.6 MPa.

And the third group - the gas consumption in which exceeds 500 m³ per hour with the design: the working pressure in the connected gas pipeline is more than 0,6 MPa, and the technical connection fee is calculated according to the individual project.

Distance from pipe to gasification facility

- What should be the distance from the house to the gas distribution network, so that you can connect to the gas under the new rules?

- for applicants (individuals) whose gas consumption does not exceed 5 cubic meters. meters per hour, and the distance from the gas-using equipment (for example, a boiler or plate) to the source gas pipeline does not exceed 200 m in a straight line, a payment for technological connection to gas distribution networks is established. Those. the cost of construction of gas pipelines to the border of the site will be fixed. This fee for connection is approved by the Committee for Prices and Tariffs of the Moscow Region - 50 thousand rubles.

Gasification under the new rules: what is included in a fixed price of 50,000 rubles?

- Under the new technological rules, at the connection of Mosoblgaz creates conditions for gasification of the house - it brings the pipe from the distribution gas pipeline to the boundary of the land plot. Next, the owner of the land or real estate object decides how to carry gas through the territory of its site. That is, a fixed amount includes the construction of a gas pipeline to the border of the applicant's land plot; a tie-in of the constructed gas pipeline; acceptance of the gas pipeline built by the applicant inside its own plot for own funds (both underground and internal part); as well as the start-up of gas.

How will the gas connection price for the second category of applicants be calculated?

As for the second category, standardized rates for connection to gas networks, which are set by the Committee for Prices and Tariffs of the Moscow Region, are also applied here. The mechanism of price formation is clearly understood here for the subscriber. The algorithm is clearly defined - a formula by which the subscriber can calculate the cost of connection independently (or with the help of specialists).

What are the terms for gasification under the new rules?

- The decree clearly defines the terms of work under the contract. For the first category of applicants, the duration of connection activities can not exceed 1 year, for the second group - 1.5 years, for the third group - 2 years or more.

Why can they refuse to issue technical specifications for gasification?

- To refuse the applicant's extradition technical conditions  may, in the absence of the technical possibility of connection (technological connection) of the capital construction object to the gas distribution network (for example, if the capacity of the gas distribution network reaches the maximum permissible value) or if the capital construction object is not subject to gasification.

Where it is necessary to submit documents for gasification and how long does it take for them to be issued?

- All work with subscribers is now carried out through the customer service (SCS), organized according to the principle of one window, where applications are accepted and contracts are concluded. SCS is open in each of 12 branches of Mosoblgaz. The agreement on the new rules is concluded within a month. The subscriber comes to Mosoblgaz, submits the application, within a month the specialists consider the technical possibility of the connection, then the technical conditions are given out, the parties sign the contract, and Mosoblgaz starts the work on the contract.

Those. the subscriber should not go to agree technical specifications, then the project and many other documents, as it should have been done before. There is no need to contact intermediaries, thus the client is completely protected from fraud of individual market participants during the gasification process.

Gasification and connection to a private gas pipeline

- What if the connection point belongs to a third party (for example, SNT)?

- If the gas consumption network to which the applicant intends to connect belongs to another subscriber, the applicant must provide consent from the main subscriber to connect the applicant's capital construction facility to its gas consumption network.

Gasification under the new rules, if the specifications have already been issued earlier

- Is it possible to connect to the gas network under the new rules, if the technical conditions have already been issued and the gasification project is scheduled before March 1?

- If you already have technical conditions, then you can apply to Mosoblgaz and conclude an agreement on technological connection under the new rules, having refused in written form the technical conditions already given out or to implement gasification according to the old rules.

What documents are needed to apply for a technological connection to gas networks?

The list of documents for an individual who is carrying out the construction (reconstruction) of an individual housing construction object, with a planned maximum hourly gas consumption of not more than 5 cubic meters (this list for applying for a technological connection is intended for those applicants who have not yet received technical conditions):

1. Application for connection (technological connection) in accordance with the established form.

2. The applicant's documents:

- copy of the passport;

- a copy of the certificate of registration with the tax authority (if available).

h. Copies of title documents to the land plot (certificate, lease agreement with the consent of the owner, etc.).

4. Copies of the right to establish the documents for the building (if available).

5. Situational plan for the location of the land plot with a viscous to the territory of the settlement (format A4).

6. If necessary, the development of a gasification calculation scheme (non-gasified buildings) is a spatial planning document containing information on the nature and density of the building and passed the coordination stage in the Architecture bodies (if any).

7. Power of attorney or other documents confirming the authority of the applicant's representative (if the request for technical specifications is submitted by the applicant's representative).

To familiarize with the documents necessary for the conclusion of the contract on technological connection for all categories of applicants, and also forms of applications and contracts it is possible on a site www.mosobgaz.ru in

Gas / Gasification and gas supply

The Russian government approved the rules for technological connection (connection) to gas networks. The waiting period for connecting to natural gas for natural persons is set at 1-2 years. Individuals for connection will have to pay from 20 000 to 50 000 rubles. It is not clear yet - will this money be levied in addition to the existing bans on the part of gas workers, or instead?

The rules for connecting to gas networks have been approved

Citizens, owners of individual houses and cottages, as well as entrepreneurs can plan the timing and cost of connecting to gas networks. At least, this follows from the decree signed by Dmitry Medvedev "On approval of the Rules for connecting the technological connection) of capital construction facilities to gas distribution networks, as well as on the change and recognition of some acts of the Government that have lost validity Russian Federation»

The document was developed by the Federal Tariff Service of Russia in accordance with the requirements of the Urban Planning Code of the Russian Federation on the need to take into account the specifics of the legislation on gas supply when issuing technical conditions for connection to gas supply facilities and in pursuance of Federal Law No. 35-FZ of April 5, 2013 "On Amendments to the Federal Law "On gas supply in the Russian Federation" and in separate legislative acts ", which establishes the procedure for regulating payment for technological connection of gas-consuming equipment to ha oraspredelitelnym networks.

The resolution establishes the rules that determine the procedure for connecting (technological connection) to the gas distribution networks of the capital construction projects designed, constructed, reconstructed or constructed, but not connected to gas distribution networks.

The rules regulate the procedure for issuing technical conditions and directly connecting the capital construction projects under construction (constructed, reconstructed) to gas distribution networks. Essential conditions of the agreement on connection to gas distribution networks are determined. The requirements for the issuance of technical conditions for connection to gas distribution networks, the criteria for the availability (absence) of the technical feasibility of technological connection are established.

The document also amends the Basic Provisions for the Formation and State Regulation of Gas Prices and Tariffs for Transportation Services in the Territory of the Russian Federation (approved by Decree of the Government of the Russian Federation No. 1021 of December 29, 2000). These changes determine the procedure and principles for regulating the amount of fees, as well as the relationship of this process with the regulation of tariffs for gas transportation services through gas distribution networks.

How much will gas connection cost for private individuals and other categories of consumers?

The resolution identifies three groups of gas consumers with different approaches to regulating the size of the board:

- consumers with gas consuming equipment with a maximum hourly gas flow rate not exceeding 5 cu. m (taking into account the gas consumption of the applicant's gas-fired equipment previously connected at this point), for simple connections at a short distance - no more than 150 m in rural areas and no more than 100 m within the boundaries of urban settlements (this capacity is sufficient to operate gas-using equipment in the composition of the household stove and the boiler, providing accommodation in a private house of up to 280 square meters of a family of four people);

- consumers whose maximum capacity of gas consuming equipment is less than 500 cubic meters. m of gas per hour inclusive and (or) the design working pressure in the attached gas pipeline is less than 6 atmospheres inclusive, except when the fee is set according to an individual project;

- consumers whose maximum capacity of gas-consuming equipment is more than 500 cubic meters. m of gas per hour and (or) the design working pressure in the connected gas pipeline is more than 6 atmospheres, and also in cases where the size of the board is set according to an individual project (for complex project solutions, providing for water transitions, horizontally inclined drilling and other complex design solutions).

In accordance with the decision of the Government of the Russian Federation, the first group of consumers also includes subjects of small and medium-sized business intending to use gas for the purposes of entrepreneurial (commercial) activity with a maximum gas consumption of not more than 15 cubic meters. m per hour.

For the first group of gas consumers, the size of the fee is set within the limits of limits - from 20 thousand to 50 thousand rubles.

For the second group of gas consumers, it is envisaged to determine the size of the fee based on the established standardized tariff rates.

For the third group of gas consumers, the fee is set on the basis of an individual project for technological connection.

Until March 1, 2014, the Federal Tariff Service will have to develop firm prices with a price list of connections depending on the distance from the "pipe". Also there will be also standard price lists for gas capacities. Above their limit levels per hour, the connection can not cost.

What will be the final cost of gasification of a private house?

Naturally, the main issue that arises in connection with the approval of the rules for connection to gas distribution networks - and how will this affect the cost of gasification? Before the release of normative acts detailing the resolution, the answer to this question is not obvious.

Decree of the Government of the Russian Federation No. 1314 of December 30, 2013 "On Approval of the Rules for Connection (Technological Connection) of Capital Construction Facilities to Gas Distribution Networks, and on Amending and Recognizing the Invalidation of Certain Acts of the Government of the Russian Federation." Download